Charging station Cambridge Industrial Estate Great Cambridge R in Enfield

Cambridge Industrial Estate Great Cambridge R in Enfield has 2 charging locations. For each charger below you'll find the connector type, maximum power, operator and access.

Charging stations at this address

SEGRO AREAS CAMBRIDGE EST 3Public

Cambridge Industrial Estate Great Cambridge R, EN1 1SH · Operator: ChargePoint · Public · Last verified: 2023-12-07

ConnectorPowerQtyCurrent
Type 2 (Socket Only)22 kW1AC (Three-Phase)

SEGRO AREAS CAMBRIDGE EST 4Public

Cambridge Industrial Estate Great Cambridge R, EN1 1SH · Operator: ChargePoint · Public · Last verified: 2023-12-07

ConnectorPowerQtyCurrent
Type 2 (Tethered Connector) 43 kW1AC (Three-Phase)

More charging stations in Enfield

Frequently asked questions

How fast can I charge at Cambridge Industrial Estate Great Cambridge R?

This is a regular charging location (max. 43 kW). For long trips, find fast chargers via the Enfield city page.

Do I need a charge card?

At virtually all public chargers you start a session with a charge card or app. The price per kWh differs per card.