Charging station Avenida de la Constitucion in Samartín del Rei Aurelio

Avenida de la Constitucion in Samartín del Rei Aurelio has 2 charging locations. For each charger below you'll find the connector type, maximum power, operator and access.

Charging stations at this address

Ayunt. Nava. Avenida de la ConstitucionFast chargerPublic

Avenida de la Constitucion, 33520 · Operator: EDP · Public - Membership Required · Last verified: 2026-04-20

ConnectorPowerQtyCurrent
CCS (Type 2)60 kW2DC
Type 2 (Socket Only)22 kW4AC (Three-Phase)

Ayunt. Nava. Zona DeportivaFast chargerPublic

Avenida de la Constitucion, 33520 · Operator: EDP · Public - Membership Required · Last verified: 2026-04-20

ConnectorPowerQtyCurrent
CCS (Type 2)60 kW2DC
Type 2 (Socket Only)22 kW4AC (Three-Phase)

More charging stations in Samartín del Rei Aurelio

Frequently asked questions

How fast can I charge at Avenida de la Constitucion?

The maximum charging power at this address is 60 kW — suitable for fast charging. Actual speed also depends on your car and how busy it is.

Do I need a charge card?

At virtually all public chargers you start a session with a charge card or app. The price per kWh differs per card.