Charging station Avenida de Andalucía (Bobadilla) in Granada

Avenida de Andalucía (Bobadilla) in Granada has 2 charging locations. For each charger below you'll find the connector type, maximum power, operator and access.

Charging stations at this address

Kia ARM Motor (EDP)Fast chargerPublic

Avenida de Andalucía (Bobadilla), 18200 · Operator: EDP · Public - Membership Required · Last verified: 2025-10-04

ConnectorPowerQtyCurrent
CCS (Type 2)50 kW1DC
Type 2 (Tethered Connector) 22 kW1AC (Three-Phase)

AUTIBERIA Concesionario Opel-Suzuki

Avenida de Andalucía (Bobadilla), 18200 · Operator: (Business Owner at Location) · Private - For Staff, Visitors or Customers · Last verified: 2022-09-30

ConnectorPowerQtyCurrent
Type 2 (Socket Only)11 kW1AC (Three-Phase)

More charging stations in Granada

Frequently asked questions

How fast can I charge at Avenida de Andalucía (Bobadilla)?

The maximum charging power at this address is 50 kW — suitable for fast charging. Actual speed also depends on your car and how busy it is.

Do I need a charge card?

At virtually all public chargers you start a session with a charge card or app. The price per kWh differs per card.