Charging station A22 Autostrada del Brennero km. 267,5 direzione sud in Bagnolo San Vito

A22 Autostrada del Brennero km. 267,5 direzione sud in Bagnolo San Vito has 1 charging location. For each charger below you'll find the connector type, maximum power, operator and access.

Charging stations at this address

ADS Sarni Po Ovest A22Fast chargerPublic

A22 Autostrada del Brennero km. 267,5 direzione sud, 46031 · Operator: (Business Owner at Location) · Public · Last verified: 2022-11-09

ConnectorPowerQtyCurrent
CHAdeMO50 kW2DC
Type 2 (Tethered Connector) 43 kW2AC (Three-Phase)
CCS (Type 2)50 kW1DC
Type 2 (Socket Only)22 kW4AC (Three-Phase)

More charging stations in Bagnolo San Vito

Frequently asked questions

How fast can I charge at A22 Autostrada del Brennero km. 267,5 direzione sud?

The maximum charging power at this address is 50 kW — suitable for fast charging. Actual speed also depends on your car and how busy it is.

Do I need a charge card?

At virtually all public chargers you start a session with a charge card or app. The price per kWh differs per card.