Engie-Vianeo - A71 - Aire de La Ferté Saint-AubinUltra-fastPublic
| Connector | Power | Qty | Current |
|---|---|---|---|
| CCS (Type 2) | 300 kW | 7 | DC |
| CHAdeMO | 60 kW | 1 | DC |
| Type 2 (Socket Only) | 22 kW | 1 | AC (Three-Phase) |
A71 - Aire de La Ferté Saint-Aubin in Chaumont-sur-Tharonne has 1 charging location. For each charger below you'll find the connector type, maximum power, operator and access.
| Connector | Power | Qty | Current |
|---|---|---|---|
| CCS (Type 2) | 300 kW | 7 | DC |
| CHAdeMO | 60 kW | 1 | DC |
| Type 2 (Socket Only) | 22 kW | 1 | AC (Three-Phase) |
The maximum charging power at this address is 300 kW — suitable for fast charging. Actual speed also depends on your car and how busy it is.
At virtually all public chargers you start a session with a charge card or app. The price per kWh differs per card.